Question - 21 : - How can World Wide Web sites be tested?

Answer - 21 : - Web sites are essentially client/server applications - with web servers and 'browser' clients. Consideration should be given to the interactions between html pages, TCP/IP communications, Internet connections, firewalls, applications that run in web pages (such as applets, javascript, plug-in applications), and applications that run on the server side (such as cgi scripts, database interfaces, logging applications, dynamic page generators, asp, etc.). Additionally, there are a wide variety of servers and browsers, various versions of each, small but sometimes significant differences between them, variations in connection speeds, rapidly changing technologies, and multiple standards and protocols. The end result is that testing for web sites can become a major ongoing effort. Other considerations might include: • What are the expected loads on the server (e.g., number of hits per unit time?), and what kind of performance is required under such loads (such as web server response time, database query response times). What kinds of tools will be needed for performance testing (such as web load testing tools, other tools already in house that can be adapted, web robot downloading tools, etc.)? • Who is the target audience? What kind of browsers will they be using? What kind of connection speeds will they by using? Are they intra- organization (thus with likely high connection speeds and similar browsers) or Internet-wide (thus with a wide variety of connection speeds and browser types)? • What kind of performance is expected on the client side (e.g., how fast should pages appear, how fast should animations, applets, etc. load and run)? • Will down time for server and content maintenance/upgrades be allowed? how much? • What kinds of security (firewalls, encryptions, passwords, etc.) will be required and what is it expected to do? How can it be tested? • How reliable are the site's Internet connections required to be? And how does that affect backup system or redundant connection requirements and testing? • What processes will be required to manage updates to the web site's content, and what are the requirements for maintaining, tracking, and controlling page content, graphics, links, etc.? • Which HTML specification will be adhered to? How strictly? What variations will be allowed for targeted browsers? • Will there be any s

Question - 22 : - How is testing affected by object-oriented designs?

Answer - 22 : - Well-engineered object-oriented design can make it easier to trace from code to internal design to functional design to requirements. While there will be little affect on black box testing (where an understanding of the internal design of the application is unnecessary), white-box testing can be oriented to the application's objects. If the application was well-designed this can simplify test design.

Question - 23 : - What is 'Software Quality Assurance'?

Answer - 23 : - Software QA involves the entire software development PROCESS - monitoring and improving the process, making sure that any agreed-upon standards and procedures are followed, and ensuring that problems are found and dealt with. It is oriented to 'prevention'. (See the Bookstore section's 'Software QA' category for a list of useful books on Software Quality Assurance.)

Question - 24 : - What is 'Software Testing'?

Answer - 24 : - Testing involves operation of a system or application under controlled conditions and evaluating the results (eg, 'if the user is in interface A of the application while using hardware B, and does C, then D should happen'). The controlled conditions should include both normal and abnormal conditions. Testing should intentionally attempt to make things go wrong to determine if things happen when they shouldn't or things don't happen when they should. It is oriented to 'detection'. (See the Bookstore section's 'Software Testing' category for a list of useful books on Software Testing.) • Organizations vary considerably in how they assign responsibility for QA and testing. Sometimes they're the combined responsibility of one group or individual. Also common are project teams that include a mix of testers and developers who work closely together, with overall QA processes monitored by project managers. It will depend on what best fits an organization's size and business structure.

Question - 25 : - Why is it often hard for management to get serious about quality assurance?

Answer - 25 : - Solving problems is a high-visibility process; preventing problems is low-visibility. This is illustrated by an old parable: In ancient China there was a family of healers, one of whom was known throughout the land and employed as a physician to a great lord. The physician was asked which of his family was the most skillful healer. He replied, "I tend to the sick and dying with drastic and dramatic treatments, and on occasion someone is cured and my name gets out among the lords." "My elder brother cures sickness when it just begins to take root, and his skills are known among the local peasants and neighbors." "My eldest brother is able to sense the spirit of sickness and eradicate it before it takes form. His name is unknown outside our home."

Question - 26 : - What is verification? validation?

Answer - 26 : - Verification typically involves reviews and meetings to evaluate documents, plans, code, requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and inspection meetings. Validation typically involves actual testing and takes place after verifications are completed. The term 'IV & V' refers to Independent Verification and Validation.

Question - 27 : - What is a 'walkthrough'?

Answer - 27 : - A 'walkthrough' is an informal meeting for evaluation or informational purposes. Little or no preparation is usually required.

Question - 28 : - What are 5 common problems in the software development process?

Answer - 28 : - • poor requirements - if requirements are unclear, incomplete, too general, or not testable, there will be problems. • unrealistic schedule - if too much work is crammed in too little time, problems are inevitable. • inadequate testing - no one will know whether or not the program is any good until the customer complains or systems crash. • featuritis - requests to pile on new features after development is underway; extremely common. • miscommunication - if developers don't know what's needed or customer's have erroneous expectations, problems are guaranteed.

Question - 29 : - What are some recent major computer system failures caused by software bugs?

Answer - 29 : - • A major U.S. retailer was reportedly hit with a large government fine in October of 2003 due to web site errors that enabled customers to view one anothers' online orders. • News stories in the fall of 2003 stated that a manufacturing company recalled all their transportation products in order to fix a software problem causing instability in certain circumstances. The company found and reported the bug itself and initiated the recall procedure in which a software upgrade fixed the problems. • In August of 2003 a U.S. court ruled that a lawsuit against a large online brokerage company could proceed; the lawsuit reportedly involved claims that the company was not fixing system problems that sometimes resulted in failed stock trades, based on the experiences of 4 plaintiffs during an 8-month period. A previous lower court's ruling that "...six miscues out of more than 400 trades does not indicate negligence." was invalidated. • In April of 2003 it was announced that the largest student loan company in the U.S. made a software error in calculating the monthly payments on 800,000 loans. Although borrowers were to be notified of an increase in their required payments, the company will still reportedly lose $8 million in interest. The error was uncovered when borrowers began reporting inconsistencies in their bills. • News reports in February of 2003 revealed that the U.S. Treasury Department mailed 50,000 Social Security checks without any beneficiary names. A spokesperson indicated that the missing names were due to an error in a software change. Replacement checks were subsequently mailed out with the problem corrected, and recipients were then able to cash their Social Security checks. • In March of 2002 it was reported that software bugs in Britain's national tax system resulted in more than 100,000 erroneous tax overcharges. The problem was partly attibuted to the difficulty of testing the integration of multiple systems. • A newspaper columnist reported in July 2001 that a serious flaw was found in off-the-shelf software that had long been used in systems for tracking certain U.S. nuclear materials. The same software had been recently donated to another country to be used in tracking their own nuclear materials, and it was not until scientists in that country discovered the problem, and shared the information, that U.S. officials became aware o

Question - 30 : - Why does software have bugs?

Answer - 30 : - • miscommunication or no communication - as to specifics of what an application should or shouldn't do (the application's requirements). • software complexity - the complexity of current software applications can be difficult to comprehend for anyone without experience in modern-day software development. Windows-type interfaces, client-server and distributed applications, data communications, enormous relational databases, and sheer size of applications have all contributed to the exponential growth in software/system complexity. And the use of object-oriented techniques can complicate instead of simplify a project unless it is well-engineered. • programming errors - programmers, like anyone else, can make mistakes. • changing requirements (whether documented or undocumented) - the customer may not understand the effects of changes, or may understand and request them anyway - redesign, rescheduling of engineers, effects on other projects, work already completed that may have to be redone or thrown out, hardware requirements that may be affected, etc. If there are many minor changes or any major changes, known and unknown dependencies among parts of the project are likely to interact and cause problems, and the complexity of coordinating changes may result in errors. Enthusiasm of engineering staff may be affected. In some fast-changing business environments, continuously modified requirements may be a fact of life. In this case, management must understand the resulting risks, and QA and test engineers must adapt and plan for continuous extensive testing to keep the inevitable bugs from running out of control - see 'What can be done if requirements are changing continuously?' in Part 2 of the FAQ. • time pressures - scheduling of software projects is difficult at best, often requiring a lot of guesswork. When deadlines loom and the crunch comes, mistakes will be made. • egos - people prefer to say things like: 'no problem' 'piece of cake' 'I can whip that out in a few hours' 'it should be easy to update that old code' instead of: 'that adds a lot of complexity and we could end up making a lot of mistakes' 'we have no idea if we can do that; we'll wing it' 'I can't estimate how long it will take, until I take a close look at it' 'we can't figure out what that old spaghetti code did i