Question - 41 : - How the Price determination process works in SAP-MM?

Answer - 41 : - Price determination process: Create a Price schema Add a condition type if required Asssign Access sequence to the condition type. Create a condition table and specify flds required. Create a cond. rec. The price schema for the particular mat. has a cond type. This pricing will trigger the Price determination process. Basically the access sequence assigned to the cond type will search the cond table to find the particular cond. rec. and determin the price.

Question - 42 : - What is the difference between stock transfer between two plants belongs to same company code and to that of different company code?

Answer - 42 : - In 1st case it is called as intra company stock transfer and the 2nd case is inter company stock transfer Stock Transfer between plants of same company code only includes inventory movement without any pricing and so called Stock Transfer Order where Stock Transfer between plants of different company code is same as a purchase order as along with the inventory there is also accounts transfer (pricing) involved.  

Question - 43 : - What is the one full implementation of life cycle in SAP-BW ?

Answer - 43 : - Full life cycle implementation means implementing the project start from requirement gathering, analysis, solution desion, mapping, implementing according to ASAP methodology.

Question - 44 : - What is Legaccy System Migration Workbench? How it can be carried out in SAP SD?

Answer - 44 : - 1. LSMW is widely used by EDI programmers. EDI Programmers connect the SAP system to Non SAP system. During this Data migration is a necessity. When data migrates from source to destination the destination code is differrent from the source code. So what LSMW does is * Converts the data in to batch files * Then converts the batch files in to source code batch files * And then mirgates data. Standard Interfaces like BAPI or Idoc are used in this process. 2. The LSMW comprises the following main steps: * Read data (legacy data in spreadsheet tables and/or sequential files). * Convert data (from the source into the target format). * Import data (to the database used by the R/3 application. But, before these steps, you need to perform following steps : * Define source structure : structure of data in the source file. * Define target structure : structure of SAP that receives data. * Field mapping: Mapping between the source and target structure with conversions, if any. * Specify file: location of the source file Of all the methods used for data migration like BDC, LSMW , Call Transaction which one is used most of the time? How is the decision made which method should be followed? What is the procedure followed for this analysis? All the 3 methods are used to migrate data. Selection of these methods depends on the scenario, amount of data need to transfer. LSMW is a ready tool provided by SAP and you have to follow some 17 steps to migrate master data. While in BDCs Session method is the better choice because of some advantages over call transaction. But call transaction is also very useful to do immediate updation of small amout of data. (In call transaction developer has to handle errors). Bottom line is make choice of these methods based of real time requirements. These methods are chosen completely based on situation you are in. Direct input method is not available for all scenarios; else, they are the simplest ones. In batch input method, you need to do recording for the transaction concerned. Similarly, IDoc, and BAPI are there, and use of these need to be decided based on the requirement. Try to go through the some material on these four methods, and implement them. You will then have a fair idea about when to use wh

Question - 45 : - What is the difference between updated project and end to end project. explain

Answer - 45 : - 1. Some organisations select to implement SAP module by module, thus gets updated as per their convenience / schedule. This is called as updated project. Some organisations simply plan all integrated functional modules and decide to go-live with all functional modules and take their entire operations on SAP. This is called as End to End SAP implementation project. 2. Upgrade Project is a project where in SAP is already in place and it is the version upgrade from a lower end to a higher version. End to End project is a project where SAP is implemented for the first time.  