Manual Testing Interview Question - 1 : -

What are 5 common solutions to software development problems?

Manual Testing Interview Answer - 1 : -

• solid requirements - clear, complete, detailed, cohesive, attainable, testable requirements that are agreed to by all players. Use prototypes to help nail down requirements.
• realistic schedules - allow adequate time for planning, design, testing, bug fixing, re-testing, changes, and documentation; personnel should be able to complete the project without burning out.
• adequate testing - start testing early on, re-test after fixes or changes, plan for adequate time for testing and bug-fixing.
• stick to initial requirements as much as possible - be prepared to defend against changes and additions once development has begun, and be prepared to explain consequences. If changes are necessary, they should be adequately reflected in related schedule changes. If possible, use rapid prototyping during the design phase so that customers can see what to expect. This will provide them a higher comfort level with their requirements decisions and minimize changes later on.
• communication - require walkthroughs and inspections when appropriate; make extensive use of group communication tools - e-mail, groupware, networked bug-tracking tools and change management tools, intranet capabilities, etc.; insure that documentation is available and up-to-date - preferably electronic, not paper; promote teamwork and cooperation; use protoypes early on so that customers' expectations are clarified.
 

Manual Testing Interview Question - 2 : -

How can Software QA processes be implemented without stifling productivity?

Manual Testing Interview Answer - 2 : -

By implementing QA processes slowly over time, using consensus to reach agreement on processes, and adjusting and experimenting as an organization grows and matures, productivity will be improved instead of stifled. Problem prevention will lessen the need for problem detection, panics and burn-out will decrease, and there will be improved focus and less wasted effort. At the same time, attempts should be made to keep processes simple and efficient, minimize paperwork, promote computer-based processes and automated tracking and reporting, minimize time required in meetings, and promote training as part of the QA process. However, no one - especially talented technical types - likes rules or bureacracy, and in the short run things may slow down a bit. A typical scenario would be that more days of planning and development will be needed, but less time will be required for late-night bug-fixing and calming of irate customers.
 

Manual Testing Interview Question - 3 : -

How can new Software QA processes be introduced in an existing organization?

Manual Testing Interview Answer - 3 : -

• A lot depends on the size of the organization and the risks involved. For large organizations with high-risk (in terms of lives or property) projects, serious management buy-in is required and a formalized QA process is necessary.
• Where the risk is lower, management and organizational buy-in and QA implementation may be a slower, step-at-a-time process. QA processes should be balanced with productivity so as to keep bureaucracy from getting out of hand.
• For small groups or projects, a more ad-hoc process may be appropriate, depending on the type of customers and projects. A lot will depend on team leads or managers, feedback to developers, and ensuring adequate communications among customers, managers, developers, and testers.
• The most value for effort will be in (a) requirements management processes, with a goal of clear, complete, testable requirement specifications embodied in requirements or design documentation and (b) design inspections and code inspections.
 

Manual Testing Interview Question - 4 : -

What is Extreme Programming and what's it got to do with testing?

Manual Testing Interview Answer - 4 : -

Extreme Programming (XP) is a software development approach for small teams on risk-prone projects with unstable requirements. It was created by Kent Beck who described the approach in his book 'Extreme Programming Explained' (See the Softwareqatest.com Books page.). Testing ('extreme testing') is a core aspect of Extreme Programming. Programmers are expected to write unit and functional test code first - before the application is developed. Test code is under source control along with the rest of the code. Customers are expected to be an integral part of the project team and to help develope scenarios for acceptance/black box testing. Acceptance tests are preferably automated, and are modified and rerun for each of the frequent development iterations. QA and test personnel are also required to be an integral part of the project team. Detailed requirements documentation is not used, and frequent re-scheduling, re-estimating, and re-prioritizing is expected. For more info see the XP-related listings in the Softwareqatest.com 'Other Resources' section
 

Manual Testing Interview Question - 5 : -

What is software 'quality'?

Manual Testing Interview Answer - 5 : -

Quality software is reasonably bug-free, delivered on time and within budget, meets requirements and/or expectations, and is maintainable. However, quality is obviously a subjective term. It will depend on who the 'customer' is and their overall influence in the scheme of things. A wide-angle view of the 'customers' of a software development project might include end-users, customer acceptance testers, customer contract officers, customer management, the development organization's management/accountants/testers/salespeople, future software maintenance engineers, stockholders, magazine columnists, etc. Each type of 'customer' will have their own slant on 'quality' - the accounting department might define quality in terms of profits while an end-user might define quality as user-friendly and bug-free.
 

Manual Testing Interview Question - 6 : -

What are 5 common problems in the software development process?

Manual Testing Interview Answer - 6 : -

• poor requirements - if requirements are unclear, incomplete, too general, or not testable, there will be problems.
• unrealistic schedule - if too much work is crammed in too little time, problems are inevitable.
• inadequate testing - no one will know whether or not the program is any good until the customer complains or systems crash.
• featuritis - requests to pile on new features after development is underway; extremely common.
• miscommunication - if developers don't know what's needed or customer's have erroneous expectations, problems are guaranteed.
 

Manual Testing Interview Question - 7 : -

What can be done if requirements are changing continuously?

Manual Testing Interview Answer - 7 : -

A common problem and a major headache.
• Work with the project's stakeholders early on to understand how requirements might change so that alternate test plans and strategies can be worked out in advance, if possible.
• It's helpful if the application's initial design allows for some adaptability so that later changes do not require redoing the application from scratch.
• If the code is well-commented and well-documented this makes changes easier for the developers.
• Use rapid prototyping whenever possible to help customers feel sure of their requirements and minimize changes.
• The project's initial schedule should allow for some extra time commensurate with the possibility of changes.
• Try to move new requirements to a 'Phase 2' version of an application, while using the original requirements for the 'Phase 1' version.
• Negotiate to allow only easily-implemented new requirements into the project, while moving more difficult new requirements into future versions of the application.
• Be sure that customers and management understand the scheduling impacts, inherent risks, and costs of significant requirements changes. Then let management or the customers (not the developers or testers) decide if the changes are warranted - after all, that's their job.
• Balance the effort put into setting up automated testing with the expected effort required to re-do them to deal with changes.
• Try to design some flexibility into automated test scripts.
• Focus initial automated testing on application aspects that are most likely to remain unchanged.
• Devote appropriate effort to risk analysis of changes to minimize regression testing needs.
• Design some flexibility into test cases (this is not easily done; the best bet might be to minimize the detail in the test cases, or set up only higher-level generic-type test plans)
• Focus less on detailed test plans and test cases and more on ad hoc testing (with an understanding of the added risk that this entails).
 

Manual Testing Interview Question - 8 : -

How does a client/server environment affect testing?

Manual Testing Interview Answer - 8 : -

Client/server applications can be quite complex due to the multiple dependencies among clients, data communications, hardware, and servers. Thus testing requirements can be extensive. When time is limited (as it usually is) the focus should be on integration and system testing. Additionally, load/stress/performance testing may be useful in determining client/server application limitations and capabilities. There are commercial tools to assist with such testing. (See the 'Tools' section for web resources with listings that include these kinds of test tools.)
 

Manual Testing Interview Question - 9 : -

What if an organization is growing so fast that fixed QA processes are impossible?

Manual Testing Interview Answer - 9 : -

This is a common problem in the software industry, especially in new technology areas. There is no easy solution in this situation, other than:
• Hire good people
• Management should 'ruthlessly prioritize' quality issues and maintain focus on the customer
• Everyone in the organization should be clear on what 'quality' means to the customer
 

Manual Testing Interview Question - 10 : -

Why does software have bugs?

Manual Testing Interview Answer - 10 : -

• miscommunication or no communication - as to specifics of what an application should or shouldn't do (the application's requirements).
• software complexity - the complexity of current software applications can be difficult to comprehend for anyone without experience in modern-day software development. Windows-type interfaces, client-server and distributed applications, data communications, enormous relational databases, and sheer size of applications have all contributed to the exponential growth in software/system complexity. And the use of object-oriented techniques can complicate instead of simplify a project unless it is well-engineered.
• programming errors - programmers, like anyone else, can make mistakes.
• changing requirements (whether documented or undocumented) - the customer may not understand the effects of changes, or may understand and request them anyway - redesign, rescheduling of engineers, effects on other projects, work already completed that may have to be redone or thrown out, hardware requirements that may be affected, etc. If there are many minor changes or any major changes, known and unknown dependencies among parts of the project are likely to interact and cause problems, and the complexity of coordinating changes may result in errors. Enthusiasm of engineering staff may be affected. In some fast-changing business environments, continuously modified requirements may be a fact of life. In this case, management must understand the resulting risks, and QA and test engineers must adapt and plan for continuous extensive testing to keep the inevitable bugs from running out of control - see 'What can be done if requirements are changing continuously?' in Part 2 of the FAQ.
• time pressures - scheduling of software projects is difficult at best, often requiring a lot of guesswork. When deadlines loom and the crunch comes, mistakes will be made.
• egos - people prefer to say things like:
'no problem'
'piece of cake'
'I can whip that out in a few hours'
'it should be easy to update that old code'
instead of:
'that adds a lot of complexity and we could end up
making a lot of mistakes'
'we have no idea if we can do that; we'll wing it'
'I can't estimate how long it will take, until I
take a close look at it'
'we can't figure out what that old spaghetti code
did i

 

Manual Testing Interview Question - 11 : -

What if the software is so buggy it can't really be tested at all?

Manual Testing Interview Answer - 11 : -

The best bet in this situation is for the testers to go through the process of reporting whatever bugs or blocking-type problems initially show up, with the focus being on critical bugs. Since this type of problem can severely affect schedules, and indicates deeper problems in the software development process (such as insufficient unit testing or insufficient integration testing, poor design, improper build or release procedures, etc.) managers should be notified, and provided with some documentation as evidence of the problem.
 

Manual Testing Interview Question - 12 : -

What if the project isn't big enough to justify extensive testing?

Manual Testing Interview Answer - 12 : -

Consider the impact of project errors, not the size of the project. However, if extensive testing is still not justified, risk analysis is again needed and the same considerations as described previously in 'What if there isn't enough time for thorough testing?' apply. The tester might then do ad hoc testing, or write up a limited test plan based on the risk analysis.
 

Manual Testing Interview Question - 13 : -

Why is it often hard for management to get serious about quality assurance?

Manual Testing Interview Answer - 13 : -

Solving problems is a high-visibility process; preventing problems is low-visibility. This is illustrated by an old parable:
In ancient China there was a family of healers, one of whom was known throughout the land and employed as a physician to a great lord. The physician was asked which of his family was the most skillful healer. He replied,
"I tend to the sick and dying with drastic and dramatic treatments, and on occasion someone is cured and my name gets out among the lords."
"My elder brother cures sickness when it just begins to take root, and his skills are known among the local peasants and neighbors."
"My eldest brother is able to sense the spirit of sickness and eradicate it before it takes form. His name is unknown outside our home."
 

Manual Testing Interview Question - 14 : -

What is 'configuration management'?

Manual Testing Interview Answer - 14 : -

Configuration management covers the processes used to control, coordinate, and track: code, requirements, documentation, problems, change requests, designs, tools/compilers/libraries/patches, changes made to them, and who makes the changes. (See the 'Tools' section for web resources with listings of configuration management tools. Also see the Bookstore section's 'Configuration Management' category for useful books with more information.)
 

Manual Testing Interview Question - 15 : -

How can it be known when to stop testing?

Manual Testing Interview Answer - 15 : -

This can be difficult to determine. Many modern software applications are so complex, and run in such an interdependent environment, that complete testing can never be done. Common factors in deciding when to stop are:
• Deadlines (release deadlines, testing deadlines, etc.)
• Test cases completed with certain percentage passed
• Test budget depleted
• Coverage of code/functionality/requirements reaches a specified point
• Bug rate falls below a certain level
• Beta or alpha testing period ends